G. S. Wark was awarded the New Plant Addition design build contract in Welland, Ontario with Hydac Corporation in June of 2015. This project is design-build and includes a 13,000 square foot pre-engineered building with crane extension to an existing system.
A drive-in bay feature is designed to accommodate loading logistics. The project will commence immediately and is scheduled for completion in January of 2016.